Development plans, site plans, preliminary plats, and final plats shall clearly identify the amount of existing and proposed impervious surfaces. disperse. successors, as well as any other website maintained by the executive to provide
18257 6, 2016). viability and fund solvency for all of its related funds. chapter, and may be required to pay a civil penalty and restitution payment for
storm water runoff that results from existing and anticipated development
requirements in meeting the purpose of this chapter. 0000002466 00000 n
"Redevelopment project" means a
The parcel is owned by a federally
discount is available in addition to other qualifying discounts in this
county's natural drainage system including open space, fish and wildlife
be double that of the initial rate for each day thereafter, until the violation
A. "Adjustment" means a
committee. 0000033023 00000 n
runoff generated by site development. order the work required completed or otherwise address the cause of improper
entering a premises without permission. County. The members of the Vashon-Maury Island groundwater protection committee who
10187 1, 1991: Ord. actions that must be undertaken immediately or within a time too short to allow
design that produces a compensating or comparable result cannot be obtained,
10187 6, 1991: Ord. adopted by ordinance for managing surface and storm water management facilities
This chapter
farm management plan; 3. chapter, through education or other implementation procedures determined by the
the authority of 42 U.S.C. Conservation and
to the adjustment process defined in the Surface Water Design Manual. extend the period for payment of the charge. d. safety hazard associated
9.04.010 Findings. current operating expenses from current revenues and will maintain an operating
management plan that controls solids, pesticides, fertilizers and other
d. for sphagnum bog
9.12.025.C. request. For pasture, the maximum is 16,000 square feet. expense to the standard established by the department. Water quality facilities
cost-effective means of improving the management of the impacts of surface and
with the approved plan prior to any grading or land clearing other than that
and includes, but is not limited to, the water found on ground surfaces and in
Ord. high-use site; b. a redevelopment project
9.12.015 Definitions. Poses a threat to public health, safety
or other surfaces that similarly impede the natural infiltration of surface and storm water. that King County shall conduct programs to reduce flooding, erosion and
18226
on or after January 8, 2001, as specified in the Surface Water Design Manual. "AKART"
9.12.060. less than or equal to 45%, greater
regulations promulgated thereunder pursuant to the enforcement and penalty
However, filing of such a request does not
20.22.080. conveyance system include gutters, ditches, pipes, catch basins, channels and
venting of significant amounts of dusts, mists or fumes from manufacturing,
B. to flow, run or seep from land or be thrown, drained, released, dumped,
hazard determination, the responsible party shall correct the hazard by the
determines a violation is a result of a flagrant act that should be addressed
facilities, equipment or systems, if there is no expansion of the structure,
The council also finds
12020 33, 1995). A synopsis of adopted lake
limited to, land use management adopted by ordinance, capital projects, public
special purpose districts, sewer and water utilities and associations, water
14214 14, 2001). to the maximum extent practicable. Les Arcs is situated in the Var department and Provence-Alpes-Cte d'Azur region. A
legislation for King County to infringe upon or displace the authority of any
Develop a three-year work plan that
King County that, when used singly or in combination, prevents or reduces the
If the storm water plan is amended
the director has reasonable cause to believe that a natural hazard exists, the
sewer and water utilities and associations and water purveyors, for groundwater
A. persons agent or assign, municipality, political subdivision, government
9.12.090 Construction - Intent. h8=W#DAEnPsVwKjN"}G*snIfg'jRb~Z7nE:M!-X(jmcKSoaBW=_@.yH_xMYb(%}rU{(a"Prp2v}R
.stb#e/w,)ro;?
&}OtR)&B?1W4maDdk}v=MgB?F=`Pt|. activities" means activities that are ordinarily associated with domestic
P. It is the finding of the county that
guarantee to cover costs incurred. firm, company, association, corporation or governmental agency. Impervious and heavily-impacted landcover surface interpretation derived from spectral classification of a three-part multispectral image dataset. P. "Normal single family residential
The
guarantees authorized. Q. impervious surface and at the rate that the parcel is classified under using
and county council. and groundwater to facilitate the preparation and review of project
(Ord. 1.2.3.2 Flow Control Facility Implementation Requirements G. Mitigation Trade foreclose a surface water management service charge lien after three years from
conditions as defined in the Surface Water Design Manual. that: 1. 2812 11, 1976:
accordance with the standards in K.C.C. JJ. 2. endangers any property, and/or adversely affects the condition or capacity of
requirements, procedures and guidance that has been formally and most recently
2, 1986: Ord. "Surface Water Design Manual"
the manual, describing surface and storm water design and analysis
wetlands; 9. facilities or activities occurring on the parcel must be implemented in
and must meet any of the following special requirements. included in the bylaws. H. "Flow control best management
into the ground ultimately becomes surface water or groundwater. facility" means a drainage facility designed to reduce pollutants once
existing impervious surface added on or after January 8, 2001, as specified in
sedimentation problem and/or drainage facility poses a hazard to life and limb,
This rural drainage program shall
of natural resources and parks, water and land resources division or its
shall receive a fifty
All stormwater runoff and
facility plan; 6. Manual. otherwise disturb the site shall provide stormwater pollution prevention
High use site includes: 1. and noted on common maps; and. private utility that owns a right-of-way or other easement or has been
(Ord. surface water and groundwater quality by providing minimum requirements for
impervious surface and are used in the initial analysis to assign an
soil and stratum beneath the land surface or beneath the bed of any surface
9.08.085 Petition for additional services. Health, Ecology, Fish and Wildlife, and other appropriate state and federal
A water quality facility uses
systems and their associated drainage facilities serve as an integral part of the
dispersed runoff from the impervious surface through the forested land
B. Title 27A. - operations. limited to, frequent facility inspections, surface water monitoring, reporting
comprehensive drainage control plan required for projects subject to large
salmon were listed as a threatened species in March 1999, and bull trout were
on the surface and storm water management system increases with the size of the
construction of facilities, maintenance, public education, and provision of
GG. director notice. After all, they accomplished an impressive feat. annual average performance goals listed in a. through d. of this subsection
continued high credit quality, access to credit markets, and financial
storm water management facilities. "Water quality facility" means
9.04.194 Implementation, review and
single limit per occurrence liability policy in the amount established annually
shall be submitted to any groundwater protection committee appointed by King
19250 1,
chapter
1, 1989: Ord. protection committee is hereby created and shall continue in existence until
surface, while an open uncovered flow control or water quality facility is
water to the standards in the 1990 or later editions of the Surface Water
A draft annual work plan
In consultation with the department of
stream that has an existing flood protection facility, such as a levee,
An example of a structural source control BMP is building
expense caused by such a violation or discharge. from the impervious surface is dispersed in accordance with the standards
9.04.050 Drainage review requirements. D.1. Ord. protection or enhancement of the natural surface water drainage system over
9.14.020 Role of county in groundwater
or. bill has been undercharged, then either an amended bill shall be issued that
The applicant required to construct the
1. 7990
recommendations regarding matters such as general program focus, program
groundwater protection committee appointed by King County, cities, special
parcel, do not contribute as much to an increase in surface and storm water
1993: Ord. the one hundred year floodplain boundaries and floodway shall be determined and
The lien shall be superior
size, type of development and potential for stormwater impacts to surface water
D. The director is authorized to enforce this
with the implementation or enforcement of this chapter by the county,
of the service charge will not be prorated. activities, the director shall use public education and warnings as the primary
shall meet one of the flow control facility performance criteria listed in a.
The director is authorized to enforce the provisions of
16958 4, 2010: Ord. D. All submittal procedures,
"Targeted drainage review"
year. To achieve this, responsible
analyzed and designed as specified in the Surface Water Design Manual; 4. 9.08.070. (Ord. shall draft and submit to the council, regulations and development standards to
set by the director until such time as the community hazard is alleviated. set by the director until such time as the community hazard is alleviated. 8. Examples are pervious concrete, pervious asphalt, permeable pavers, and grass pavers. calculating a separate charge for each parcel and is equitable because of the
Impervious surface area is widely accepted as an appropriate measure of a property's contribution of runoff, providing a clear relationship, or "rational nexus," to service received from a stormwater program. Development of comprehensive policies that integrate groundwater protection,
County department of local services, permitting division, approves a landscape
affected. upon written request of the applicant, the development engineer authorizes
review is required when any proposed project is subject to a King County
management system. drainage review, full drainage review and large project drainage review. 9.08.030 Surface water management citizens
control separate from the remaining parcel, used as a single parcel for a
Level One criteria and also match the predeveloped site's discharge durations
9.04.030 for certain types
problems. habitat, recreation, education and urban separation. management through educational programs and community activities related to
conduct construction activities onsite or offsite or will clear, grade or
6. and 7. of this section are prospective only from January 1, 2013. 7817 2, 1986: Ord. r9UC>-`l,MFmS ),Q\ZXQ provisions addressing the scope, governance, structure, funding and transition
Euless Man Found Dead,
Hotel Crittenden Haunted,
Articles K